The multiple cell landfill expansion consisted of a 65-acre site. The landfill cells were below groundwater and required continuous dewatering to complete the project. Excavation activities occurred in two – 10 hour shifts utilizing multiple excavation crews to meet the rigorous project schedule. Over 2.1M cubic yards of earth was moved along with the installation of 2.8M square feet of geosynthetic liner.
Client

Waste Connections

Category

Environmental